INSPECTION OF SANTA CRUZ DAM OUTLET PIPE, CHIMAYO, NM - 2016

On November 20, 2016, Engineers from the office of William J. Miller Engineers, Inc. inspected the outlet pipe at the Santa Cruz Dam. The Santa Cruz dam is owned by the Santa Cruz Irrigation District and provides an irrigation water supply for lands along the Santa Cruz River between Chimayo and Espanola, NM. Santa Cruz Dam is a 117 ft. tall concrete and roller-compacted concrete arch dam with an active storage capacity of about 3,200 acre-feet. The Santa Cruz Dam outlet pipe is a 42-inch diameter stainless steel pipe (304L) with ¼” wall thickness and is located downstream of a 36” jet-flow gate valve. The downstream housing of the jet-flow gate valve is carbon steel and is connected to the outlet pipe at a flanged joint. The length of the pipe downstream of the joint is 36.2 feet. The outlet pipe and valve were installed in 1989 during the modification of Santa Cruz Dam. Access to the pipe was gained by climbing a ladder placed in a boat floating in the spillway stilling basin. The boat was anchored to the spillway wall and to the downstream face of the spillway.

 

PROJECTS OUT FOR BID
 

ACEQUIA MESA DEL MEDIO:

Sealed bids for the construction of the Acequia Mesa del Medio Phase I: Compuerta Rehabilitation Project, Rio Arriba County, NM, will be received by the Acequia Mesa del Medio at the office of William J. Miller Engineers, Inc., 1511 Third St, Santa Fe, NM 87505, until 5:00 pm on November 1, 2017.  The bids will be opened and read aloud at 5:00 pm on November 1, 2017 at the office of William J. Miller Engineers, Inc.

A non-mandatory pre-bid meeting will be conducted at the Project site, beginning at 10:00 am on October 28, 2017. Prospective bidders are encouraged to attend and requested to meet at the Santa Teresa Church approximately 7 miles west of Coyote, NM before touring the Project site.

Copies of the Contract Documents may be obtained at the office of William J. Miller Engineers, Inc., 1511 Third St, Santa Fe, NM 87505 (505-983-7694) upon payment of a deposit of $50.00 for each set.  The deposit will be refunded upon return of Contract Documents in good condition not later than fifteen days following opening of the bids. Copies of Contract Documents are also available via e-mail.

INVITATION TO BID

PLAN HOLDERS LIST

ADDENDUM NO. 1

BID TABULATION

 

ARCHIBEQUE DITCH DIVERSION STRUCTURE REHABILITATION AND PIPELINE:

Sealed bids for the construction of the Archibeque Ditch Diversion Structure and Pipeline Project, Sandoval County, NM, were received by the Archibeque Community Ditch, opened and read aloud at the office of William J. Miller Engineers, Inc., 1511 Third St., Santa Fe, NM 87505, on September 18, 2017.

A mandatory pre-bid meeting was conducted at the Project site near Cuba, NM, on September 6, 2017.

The Engineer's probable cost estimate for this project is $336,000.

PLAN HOLDERS LIST

BID TABULATION

 

The contract for the Archibeque Ditch Diversion Dam and Pipeline Project has been awarded to Sichler Construction.

 

 

 

 
 
COMPLETED PROJECTS
 
 
ACEQUIA DEL BARRANCO BLANCO   ACEQUIA SAN RAFAEL DEL GUIQUE
The contract for the Acequia del Barranco Blanco was awarded on April 4, 2016 to Roybal Enterprises General Contractor's. Work on this project has been completed. The final inspection was held on June 23, 2016.   The contract for the Acequia San Rafael del Guique was awarded on January 22, 2016 to Allied 360 Construction, LLC. Work on this project has been completed. The final inspection was held on June 28, 2016.
 
ABAJO DEL PEÑASCO COMMUNITY DITCH   ACEQUIA DE JOSE GABRIEL ORTIZ
The contract for the Abajo Del Peñasco Community Ditch was awarded to Barney & Son Excavating on January 27, 2016. Work on this project has been completed. The final inspection was held on February 26, 2016.   The contract was awarded to Los Alamos Landscaping & More on December 28, 2015. Work on this project has been completed. The final inspection was held on March, 2016.
 

 